Canadian Niagara Hotels / Fallsview Waterpark Project

Surface Design Systems was contracted to remove the initial installation of a dry pack mix design in the new change rooms and shower areas under construction. Surface Design Systems installed Mapei HCT bonded topping technology to achieve a positive flow to all drains in all directions as specified 2 1/2" from all walls to a  0" termination at the drains.

The system included a positive side water-proofing installed over a shot blasted surface followed by the specialty concrete topping and self leveling portland cement base underlayment to achieve a flat smooth surface that exhibited a positive slope to specification.
 
As illustrated below, the fine lines of the finished product ( Ultra Flooring ) exhibit the qualities of this proprietary system installed by Surface Design Systems.

 

I'm absolutely thrilled with the floors that you did in our home. Your crew worked consistently and diligently in getting the project completed.
Elaine Cecconi