Lindsay Super Jail - Moisture Control
Surface Design Systems has been correcting moisture, water vapour drive in concrete surfaces successfully over the last 10 years, ranging up to 20Ilb problems.
We were selected by this client and their general contractor to address and correct a moisture issue within this maximum-security facility.
For more information on this project, click here.
Surface Design Systems is a Certified Applicator of Synthetic30 Moisture Control System.

